Photos of the PreSPEC Instalation :

Start presentation

Slide 1: The plate is cut and the plates for the rails are installed

Wen_9_11_2011_cut

Slide 2: The position of the LYCCA legs

Wen_9_11_2011_rails_LYCCA
The position of the LYCCA legs was marked on the floor plate.There is too little distance between the new rails and the front legs of the LYCCA table. The LYCCA table will be shortened to provide sufficient space for the LYCCA alignment mechanism.

Slide 3: Start construction of the container

Wen_9_11_2011_container
Start construction of the container for the CPU farm and the pre-processing units

Slide 4: The beam right rails are now aligned

Fri_11_11_2011_rails

Slide 5: Checking that the rails on the left hand side are parallel

Mon 14 Nov 2011 rail alaigment Mon_14_Nov_2011_rail_alaigment1

Slide 6: Container walls are in place

Tue_15_Nov_2011_cont_win

Slide 7: Container roof is in place

Tue_15_Nov_2011_cont_roof

Slide 8: Container air in/out holes

Tue_15_Nov_2011_cont_air_flow

Slide 9: Prepare to cement/grout the new rails

Wen 16 Nov 2011 prepare for cementing

Slide 10: Ground the new rails, two plates per rail

Wen 16 Nov 2011 grounding

Slide 11: The rails on the right hand side are installed and aligned

Thu 17 Nov 2011 all rails are in place

Slide 12: Installing the new cables for the step motors and switches controlling the opening of the array

Tue 22 Nov 2011 new cables for the step motors and switches

Slide 13: Cement the new rails

Fri_24_Nov_2011_seal_for_leaks_with_si Fri_25_Nov_2011_cemen
On the left, silicone is used to seal the volume in which cement will be poured. The cement was poured on Fri 25 Nov 2011.

Slide 14: Installing the platforms for the digitizer racks and detector support

28Nov2012_right_rack_platform 28Nov2012_left_rack_platform

Slide 15: Installing the air-conditioning and electricity to the computer container

28Nov2012_fan
28Nov2012_cooling_unit 28Nov2012_air_tubes

Slide 16: Installing the 90 deg from the lower structure

Wen_29_Nov_2011_adjusting_the_90_d_con

Slide 17: The 4 racks which will be mounted on the AGATA platform are delivered

Tue_30_Nov_2011_racks_are_here

Slide 18: The electronics/CPU hut is finished and the second UPS is installed

the hut is finished second ups is installed

Slide 19: CPU farm installation

The cpu farm cpu farm terminal
cabling of the farm switch

Slide 20: The right lower platform is assembled

right lower platform

Slide 21: The racks for the electronics on the right-hand side are mounted

Mon_19_Dec_2011_the_right-hand_side racks_are_in_place
The gantries for the optic-fibres to the digitisers were installed. They are visible on the photograph to the left and right of the LYCCA cable gantry.

Slide 22: The air-conditioning for the CPU farm is on. Work has started on the cable trays for the optic-fibres

Mon_19_Dec_2011_air-conditioning_on Mon_19_Dec_2011_work_on_the_cable_trays

Slide 23: The cable trays to S4 are finished

Fri_6_2012_cable_trays_to_S4 [[https://g-wiki.gsi.de/pub/SWiki/PreSpecInstalation/Fri_6_2012_cable_trays_in_S4.JPG] Fri_6_2012_cable_trays_in_S4]]

Slide 24: The crane motor is rotated, so the AGATA array can open further in beam left direction.

The crane motor is rotated

Slide 25: Mechanical structure mounted, honeycomb cut in 2 parts.

Mechanical structure

-- PlamenSBoutachkov - 11 Nov 2011
I Attachment Action Size Date Who Comment
28Nov2012_air_tubes.JPGJPG 28Nov2012_air_tubes.JPG manage 175 K 2011-11-28 - 17:59 PlamenSBoutachkov 28Nov2012_air_tubes
28Nov2012_cooling_unit.JPGJPG 28Nov2012_cooling_unit.JPG manage 191 K 2011-11-28 - 17:58 PlamenSBoutachkov 28Nov2012_cooling_unit
28Nov2012_fan.JPGJPG 28Nov2012_fan.JPG manage 177 K 2011-11-28 - 17:58 PlamenSBoutachkov 28Nov2012_fan
28Nov2012_left_rack_platform.JPGJPG 28Nov2012_left_rack_platform.JPG manage 194 K 2011-11-28 - 17:56 PlamenSBoutachkov 28Nov2012_left_rack_platform
28Nov2012_right_rack_platform.JPGJPG 28Nov2012_right_rack_platform.JPG manage 222 K 2011-11-28 - 17:57 PlamenSBoutachkov 28Nov2012_right_rack_platform
Fri.3.Feb.2012_Mech.JPGJPG Fri.3.Feb.2012_Mech.JPG manage 1 MB 2012-02-04 - 10:22 FredericAmeil Mechanical Structure
Fri_11_11_2011_rails.JPGJPG Fri_11_11_2011_rails.JPG manage 235 K 2011-11-11 - 20:08 PlamenSBoutachkov Fri_11_11_2011_rails
Fri_24_Nov_2011_seal_for_leaks_with_si.JPGJPG Fri_24_Nov_2011_seal_for_leaks_with_si.JPG manage 207 K 2011-11-25 - 10:16 PlamenSBoutachkov Fri_24_Nov_2011_seal_for_leaks_with_si
Fri_25_Nov_2011_cement_0.JPGJPG Fri_25_Nov_2011_cement_0.JPG manage 203 K 2011-11-25 - 10:17 PlamenSBoutachkov Fri_25_Nov_2011_cement
Fri_6_2012_cable_trays_in_S4.JPGJPG Fri_6_2012_cable_trays_in_S4.JPG manage 203 K 2012-01-09 - 16:16 PlamenSBoutachkov Fri_6_2012_cable_trays_in_S4
Fri_6_2012_cable_trays_to_S4.JPGJPG Fri_6_2012_cable_trays_to_S4.JPG manage 208 K 2012-01-09 - 16:15 PlamenSBoutachkov Fri_6_2012_cable_trays_to_S4
Fri_6_Jan_2011-motor-rotation.JPGJPG Fri_6_Jan_2011-motor-rotation.JPG manage 184 K 2012-01-16 - 10:05 PlamenSBoutachkov The crane motor is rotated
Mon_14_Nov_2011_rail_alaigment.JPGJPG Mon_14_Nov_2011_rail_alaigment.JPG manage 214 K 2011-11-15 - 19:18 PlamenSBoutachkov Mon 14 Nov 2011 rail alaigment
Mon_14_Nov_2011_rail_alaigment1.JPGJPG Mon_14_Nov_2011_rail_alaigment1.JPG manage 202 K 2011-11-15 - 20:01 PlamenSBoutachkov Mon_14_Nov_2011_rail_alaigment1
Mon_19_Dec_2011_air-conditioning_on.JPGJPG Mon_19_Dec_2011_air-conditioning_on.JPG manage 72 K 2011-12-19 - 17:49 PlamenSBoutachkov Mon_19_Dec_2011_air-conditioning_on
Mon_19_Dec_2011_the_right-hand_sideracks_are_in_place.JPGJPG Mon_19_Dec_2011_the_right-hand_sideracks_are_in_place.JPG manage 290 K 2011-12-19 - 17:48 PlamenSBoutachkov Mon_19_Dec_2011_the_right-hand_side racks_are_in_place
Mon_19_Dec_2011_work_on_the_cable_trays.JPGJPG Mon_19_Dec_2011_work_on_the_cable_trays.JPG manage 292 K 2011-12-19 - 17:50 PlamenSBoutachkov Mon_19_Dec_2011_work_on_the_cable_trays
Thu_17_Nov_2011_all_rails_in_place.JPGJPG Thu_17_Nov_2011_all_rails_in_place.JPG manage 234 K 2011-11-17 - 15:53 PlamenSBoutachkov Thu 17 Nov 2011 all rails are in place
Tue_15_Nov_2011_cont_air_flow.JPGJPG Tue_15_Nov_2011_cont_air_flow.JPG manage 204 K 2011-11-15 - 20:04 PlamenSBoutachkov Tue_15_Nov_2011_cont_air_flow
Tue_15_Nov_2011_cont_roof.JPGJPG Tue_15_Nov_2011_cont_roof.JPG manage 207 K 2011-11-15 - 20:03 PlamenSBoutachkov Tue_15_Nov_2011_cont_roof
Tue_15_Nov_2011_cont_win.JPGJPG Tue_15_Nov_2011_cont_win.JPG manage 196 K 2011-11-15 - 20:01 PlamenSBoutachkov Tue_15_Nov_2011_cont_win
Tue_22_Nov_2011_new_cables_for_the_step_motors.JPGJPG Tue_22_Nov_2011_new_cables_for_the_step_motors.JPG manage 247 K 2011-11-22 - 19:18 PlamenSBoutachkov Tue 22 Nov 2011 new cables for the step motors and switches
Tue_30_Nov_2011_racks_are_here.JPGJPG Tue_30_Nov_2011_racks_are_here.JPG manage 197 K 2011-11-30 - 09:43 PlamenSBoutachkov Tue_30_Nov_2011_racks_are_here
Wen_16_Nov_2011_grounding.JPGJPG Wen_16_Nov_2011_grounding.JPG manage 202 K 2011-11-16 - 17:31 PlamenSBoutachkov Wen 16 Nov 2011 grounding
Wen_16_Nov_2011_prepare_for_cementing.JPGJPG Wen_16_Nov_2011_prepare_for_cementing.JPG manage 236 K 2011-11-16 - 17:30 PlamenSBoutachkov Wen 16 Nov 2011 prepare for cementing
Wen_29_Nov_2011_adjusting_the_90_d_con.JPGJPG Wen_29_Nov_2011_adjusting_the_90_d_con.JPG manage 205 K 2011-11-30 - 09:42 PlamenSBoutachkov Wen_29_Nov_2011_adjusting_the_90_d_con
Wen_9_11_2011_container.JPGJPG Wen_9_11_2011_container.JPG manage 220 K 2011-11-11 - 20:09 PlamenSBoutachkov Wen_9_11_2011_container
Wen_9_11_2011_cut.JPGJPG Wen_9_11_2011_cut.JPG manage 241 K 2011-11-11 - 20:09 PlamenSBoutachkov Wen_9_11_2011_cut
Wen_9_11_2011_rails_LYCCA.JPGJPG Wen_9_11_2011_rails_LYCCA.JPG manage 227 K 2011-11-11 - 20:10 PlamenSBoutachkov Wen_9_11_2011_rails_LYCCA
cabling_of_the_farm.jpegjpeg cabling_of_the_farm.jpeg manage 373 K 2011-12-16 - 11:28 PlamenSBoutachkov cabling of the farm
cpu_farm_terminal.JPGJPG cpu_farm_terminal.JPG manage 271 K 2011-12-16 - 11:27 PlamenSBoutachkov cpu farm terminal
right_lower_platform.JPGJPG right_lower_platform.JPG manage 250 K 2011-12-16 - 11:30 PlamenSBoutachkov right lower platform
switch.jpegjpeg switch.jpeg manage 238 K 2011-12-16 - 11:29 PlamenSBoutachkov switch
the_cpu_farm.JPGJPG the_cpu_farm.JPG manage 196 K 2011-12-16 - 11:24 PlamenSBoutachkov The cpu farm
the_hut_is_finished.JPGJPG the_hut_is_finished.JPG manage 200 K 2011-12-16 - 11:21 PlamenSBoutachkov the hut is finished
ups_is_installed.JPGJPG ups_is_installed.JPG manage 225 K 2011-12-16 - 11:22 PlamenSBoutachkov second ups is installed
Topic revision: r17 - 2012-02-04, FredericAmeil
Create personal sidebar

2024-10-13 - 09:10

Copyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding g-wiki Send feedback | Imprint | Privacy Policy (in German)