back to AgataDetector

In Beam Test of AGATA S001

  • Expected test dates: 17-23 September, 2010

  • target_frame.pdf: Design of target frame for in-beam tests with extended target

  • Saturated traces + INHC signals from cosmics with Oscilloscope (Attachment 1)

  • Saturated traces + INHC signals from cosmics with Oscilloscope (Attachment 2)

  • (Left) Lead Target 100x75x0.5 mm size, two pieces available (Right) Target with Aluminium frame:
    (Left) Lead Target 100x75x0.5 mm size, two pieces available (Right) Target with Aluminium frame

-- CesarDomingo - 01 Sep 2010
Topic attachments
I Attachment Action Size Date Who Comment
event_bsl_slope.gifgif event_bsl_slope.gif manage 8.7 K 25 Aug 2010 - 14:09 CesarDomingo Saturated traces + INHC signals from cosmics with Oscilloscope
event_high_energy.gifgif event_high_energy.gif manage 9.2 K 25 Aug 2010 - 14:11 CesarDomingo Saturated traces + INHC signals from cosmics with Oscilloscope (attachment 2)
osci_data_cosmics.tgztgz osci_data_cosmics.tgz manage 8130.8 K 25 Aug 2010 - 14:12 CesarDomingo Oscilloscope data containing saturated traces for ToT method (from Cosmics)
Topic revision: r3 - 01 Sep 2010, CesarDomingo
Create personal sidebar

22 Sep 2019 - 06:34

 
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding g-wiki? Send feedback
Imprint (in German)
Privacy Policy (in German)